Florida Information · Ocean and coast

Oil Rigs in the Gulf: Where Platforms Are, Who Regulates Them and How They Retire

How offshore platforms in federal Gulf waters are regulated, what the law requires when they stop producing, and how a few become artificial reefs.

Official-source review: November 20, 2026 · Independent Florida guide

Florida information in plain text. No need to ask AI.

Free to read · No account needed · Print or save as PDF

1

Follow the retirement process

See how plugging wells, removing equipment and clearing a site fit together.

See the steps

2

Understand reef approval

A retired platform needs permits and review before it can become a reef.

Read how reefing works
Important: Federal rules, agency structures, and program policies change. This page describes current rules and programs as the agencies state them; it does not predict future leasing or drilling. This page is general information, not legal, navigation, or food-safety advice.

Quick answer

Offshore oil and gas platforms in the Gulf sit mostly in federal waters on the Outer Continental Shelf, and most are off Louisiana and Texas. Two Interior Department bureaus share oversight: the Bureau of Ocean Energy Management (BOEM) manages the offshore resources, and the Bureau of Safety and Environmental Enforcement (BSEE) handles safety, environmental enforcement, and decommissioning. When a lease ends, federal rules generally require operators to plug wells and remove platforms within one year and clear the seafloor. Under Rigs-to-Reefs, BSEE may allow a retired structure to become an artificial reef, but only case by case, when a state reef program accepts it and engineering, environmental, permit, and Coast Guard requirements are met. Florida's constitution prohibits drilling for oil or gas beneath state waters.

From working platform to retirement

A simplified sequence, with agency approval throughout
StageWhat happensWhat to check
Plan the workThe operator submits the proposed decommissioning work.BSEE approvals, deadlines and responsibilities.
Close the wellsWells are permanently plugged under the applicable requirements.An artificial-reef proposal does not remove well-plugging obligations.
Remove or convert the structureEquipment usually goes ashore; a permitted structure may qualify for reefing.State acceptance, Corps permit, navigation review and environmental suitability.
Clear and verify the siteRequired cleanup and verification follow the approved plan.Document the permitted reef location and any continuing responsibilities.

Federal waters and Florida state waters

BOEM's Gulf region manages offshore resources in federal waters off Texas, Louisiana, Mississippi, Alabama, and Florida. Closer to shore are state waters. Article II, Section 7(c) of the Florida Constitution says drilling for exploration or extraction of oil or natural gas is prohibited on lands beneath all state waters that have not been alienated and that lie between the mean high water line and the outermost boundaries of the state's territorial seas. It says the prohibition does not apply to transporting oil and gas products produced outside those waters, and that the subsection is self-executing.

Where the platforms are

BOEM describes the Gulf as the country’s main offshore oil-and-gas producing region. BSEE says most platforms involved in its reefing program are off Louisiana and Texas. It distinguishes a production platform, which supports extraction and processing, from a drilling rig, which drills wells. Counts change as structures are installed, removed or converted; use BSEE’s linked data resources for a dated inventory.

BSEE distinguishes platforms, which support the extraction and processing of oil and gas, from drilling rigs, which drill the wells.

Who regulates what

BOEM's stated mission is to manage development of U.S. Outer Continental Shelf energy, mineral, and geological resources in an environmentally and economically responsible way, under the authority of the Outer Continental Shelf Lands Act. BSEE describes itself as the lead agency for advancing safety, environmental protection, and resource conservation related to energy development on the Outer Continental Shelf, through regulatory oversight and enforcement. BSEE says its decommissioning authority comes from 43 U.S. Code 1334 and 30 CFR Part 250, Subpart Q.

Decommissioning requirements

BSEE says decommissioning obligations are part of the original lease from the first signature. Under 30 CFR 250.1703, when facilities are no longer useful, the operator must:

Section 250.1728 requires platforms and other facilities, including templates and pilings, to be removed to at least 15 feet below the mud line unless an alternate depth is approved. Under the same subpart, a prior lessee or owner of operating rights can remain liable for decommissioning obligations that accrued on its watch.

Idle iron and storms

BSEE uses the term "idle iron" for infrastructure that is no longer economically viable, severely damaged, or idle on active leases. It says its policy requires companies to dismantle and dispose of such infrastructure after plugging non-producing wells, for environmental and safety reasons. BSEE notes that hurricanes have toppled, damaged, or destroyed production structures, and that idle facilities pose an unnecessary risk of leaks and of damage to the ecosystem, passing ships, and commercial fishermen. In most cases, BSEE says, topsides are taken to shore for recycling or reuse, and the substructure is cut about 15 feet below the mudline and brought to shore.

Rigs-to-Reefs: how it works

BSEE says platforms become habitat for marine life soon after installation, and that it adopted a national Rigs-to-Reefs policy in response to concerns from fishermen, divers, and coastal states. Under 30 CFR 250.1730, BSEE's Regional Supervisor may grant a departure from the removal requirement by approving partial removal or toppling in place for conversion to an artificial reef if:

BSEE describes three methods: tow-and-place, topple-in-place, and partial removal, in which the top is cut at a permitted navigational depth, typically 85 feet, and placed beside the base. BSEE says that in most cases half of the operator's cost savings is donated to the state's artificial reef program.

Not automatic: decided case by case

Asked whether all platforms can be used for reefing, BSEE answers no, citing engineering and environmental standards. It says platform size, complexity, structural integrity, and location are key considerations; complex, stable, durable, and clean platforms are generally candidates; and platforms toppled by structural failure are not. Each proposal starts with the state: a state artificial reef coordinator decides whether the state wants a structure, identifies a suitable site, and secures the Corps permit, and a BSEE reef team then reviews the operator's removal application. BSEE says more than 600 platforms previously installed on the Outer Continental Shelf have been reefed in the Gulf.

Florida's role

BSEE lists Florida among the five Gulf states with an approved artificial reef plan, and says all five have incorporated decommissioned platforms into their programs, while Louisiana and Texas are the primary participants. In Florida, the FWC Artificial Reef Program provides financial and technical assistance to coastal local governments, nonprofits, and state universities to build and monitor reefs, and FWC says more than 4,548 planned public artificial reefs have been placed off Florida since the 1940s.

FWC warns that placing reef material outside an Army Corps of Engineers permitted area violates the permit and may be illegal ocean dumping with significant federal penalties. It says the only Florida program that lets private individuals deploy reefs is limited to existing county-held permitted areas in Escambia, Bay, and Okaloosa counties.

The FWC reef page links to the official deployment locator. A reef record is not a guarantee of current depth, safe diving conditions or unrestricted fishing. Check current navigation notices and rules for the site before planning a trip.

Official sources and current guidance

Reviewed November 20, 2026. These links control if a rule, season, or contact number changes.

  1. BOEM: Gulf region office
  2. Bureau of Safety and Environmental Enforcement
  3. BSEE: Decommissioning
  4. BSEE: Rigs-to-Reefs
  5. Electronic Code of Federal Regulations: 30 CFR Part 250, Subpart Q, Decommissioning activities
  6. Florida Constitution, Article II, Section 7
  7. FWC: Artificial reefs

THIS IS FLORIDA is an independent informational resource and is not affiliated with a Florida government agency. Confirm current details with the responsible agency before acting.