Florida Information · Energy and utilities

Solar Farms in Florida

What utility-scale solar is in Florida, how solar facilities are sited and permitted, what neighbors can do, and how rooftop solar and net metering differ.

Official-source review: November 20, 2026 · Independent Florida guide

Florida information in plain text. No need to ask AI.

Free to read · No account needed · Print or save as PDF

2

Check stormwater permits

Find the agency handling drainage and wetland permits for the exact site.

Find the permit agency

3

Considering rooftop solar?

Get the utility’s terms and the full contract costs before you decide.

Print questions to ask
Important: Plans, rules, rates, schedules, and project status can change. Use the linked official agency pages and documents for the final answer in your situation. This page is general information, not legal, real estate, engineering, or financial advice.

Quick answer

Solar is a growing part of Florida's power supply. EIA reports that solar supplied 11% of Florida's net generation in 2025 and that about five-sixths of Florida's solar generation came from utility-scale facilities of 1 megawatt or larger. Under section 163.3205, Florida Statutes, a solar facility is a permitted use in agricultural land use categories and agricultural zoning districts in unincorporated areas, subject to setback and buffer rules for similar uses.

Neighbors can follow local hearings, read permit files, and speak at public meetings. Rooftop solar is different: it serves a customer’s premises. Eligible systems can participate in the utility’s net metering program after meeting its interconnection and approval requirements.

What utility-scale solar is

EIA separates solar into utility-scale facilities (1 megawatt or larger) and small-scale installations (under 1 megawatt), such as rooftop panels. EIA reports Florida was third in the nation in total solar generating capacity and among the top five states for new utility-scale solar added in 2025. It also says nearly all of the state's recent and planned generating capacity additions are natural gas-fueled or solar-powered.

The PSC's November 2026 review of utility Ten-Year Site Plans reports about 16,018 MW of renewable capacity in Florida, about 92% of it solar photovoltaic, and expects renewables to grow by about 20,378 MW over the 10-year planning period, all of it solar. Solar’s installed capacity is larger than the portion counted on for peak-demand reliability. In the PSC review, about 35% of existing solar capacity and 11.6% of planned additions count as firm summer-peak capacity. Those planning values vary with timing, utility assumptions and the rest of the system; they are not annual electricity-production percentages.

What state law says about where solar farms can go

Section 163.3205, Florida Statutes, defines a solar facility as a power production facility that uses photovoltaic modules, may store energy on site, and delivers power mainly for offsite use. It may include transmission lines, substations, and energy storage equipment.

The statute makes a solar facility a permitted use in all agricultural land use categories of a local comprehensive plan and in all agricultural zoning districts in unincorporated areas, as long as it meets the setback and landscaped buffer standards for similar uses. A county may adopt an ordinance on buffers and landscaping, but those requirements may not exceed the requirements for other similar permitted uses in agricultural areas. The section does not apply to sites with a solar application submitted to a local government before July 1, 2021.

Stormwater and construction rules

Section 163.3205 also requires applicants for stormwater permits under section 373.413 to include an erosion and sediment control plan for construction. The plan must include soil percolation testing, stormwater best management practices based on rainfall up to the 100-year, 24-hour design storm, and clearing and stabilization in phases. A certified Florida stormwater, erosion, and sedimentation control inspector must inspect during construction.

Within the Northwest Florida Water Management District, the statute says operational stormwater systems for new solar facilities applied for after July 1, 2026, must be designed for the 100-year, 24-hour storm. Permit files for these projects are held by DEP or the water management district.

State siting review for larger plants

Section 403.503(14) excludes steam or solar facilities of less than 75 MW from the Electrical Power Plant Siting Act’s definition unless the applicant chooses that process. Thus 75 MW itself is not below the threshold. Capacity definitions and project details matter; ask DEP which approvals apply to the particular proposal.

The PSC’s November 2026 planning review says the planned solar projects it reviewed are below 75 MW and do not require the Commission’s preconstruction approval. That does not eliminate other applicable land-use, stormwater, environmental or construction requirements. Check the local planning office and the permitting agency for the exact review route and deadlines.

What neighbors can do

Because section 163.3205 makes solar a permitted use in those agricultural areas, comments are most useful when they address the standards that apply, such as buffers, setbacks, and drainage.

Ask which process applies. Not every permitted-use application requires a rezoning or public hearing. The ordinary county-ordinance notice rule is not a universal deadline for every permit. Ask whether comments are accepted, where to submit them, which standards govern the decision and the applicable deadline. Public comment does not automatically block a legally permitted use.

Site address, parcel and application number: ______________________________

Planning contact and permitting agency: ______________________________

Comment or hearing deadline: ______________________________

Drainage, access and buffer questions: ______________________________

Rooftop solar versus solar farms

Florida law defines customer-owned renewable generation as a system on a customer's premises that is mainly intended to offset part or all of that customer's own electricity use (section 366.91). A solar farm, by contrast, delivers power to the grid for use elsewhere.

The PSC reports that by the end of 2025 319,068 customer-sited systems totaling about 3,150 MW were installed statewide, nearly all solar. EIA reports that small-scale solar generation in 2025 was about five times greater than in 2020, in part because state restrictions on leased solar systems were removed.

Net metering rules

Section 366.91 defines net metering as a metering and billing method where customer-owned renewable generation offsets the customer's electricity use on site. It required investor-owned utilities to offer a standardized interconnection agreement and net metering program under PSC rules, and required each municipal utility and rural electric cooperative to develop its own program and report participation to the PSC every year.

The PSC's 2026 review states that under Rule 25-6.065, Florida Administrative Code, investor-owned utilities must offer net metering for renewable systems up to 2 MW. If you are served by a city utility or cooperative, ask it for its own net metering and interconnection rules in writing before you sign a solar contract.

Warning signs and where to get help

Verify solar offers independently with your utility using the number on your bill. Do not treat a salesperson’s claimed utility affiliation or savings estimate as utility approval. For questions about an investor-owned utility’s net metering or billing, call the PSC at 800-342-3552. For a nearby solar farm, start with the planning office and the agency handling its environmental permits.

For questions about an investor-owned utility's net metering or billing, call the PSC at 800-342-3552. For a proposed solar farm near you, start with the county planning department and the county commission clerk.

Questions before signing for rooftop solar

The utility’s written terms and your signed contract determine the arrangement. This checklist makes no promise of a particular saving or payback period.

Official sources and current guidance

Reviewed November 20, 2026. These links control if a rule, plan, or project status changes.

  1. U.S. EIA — Florida State Profile and Energy Estimates (analysis)
  2. Florida PSC — Review of the 2026 Ten-Year Site Plans (November 2026)
  3. Florida Statutes 163.3205 — Solar facility approval process
  4. Florida Statutes 366.91 — Renewable energy and net metering
  5. Florida Statutes 286.0114 — Reasonable opportunity to be heard
  6. Florida Statutes 125.66 — County ordinances and notice
  7. Florida PSC — Scam Alert
  8. Florida Statutes s. 403.503 — Power-plant siting definitions
  9. Florida DEP — Environmental Resource Permitting and district links

THIS IS FLORIDA is an independent informational resource and is not affiliated with a Florida government agency. Confirm current details with the responsible agency before acting.